Kian Hock Engineering Pte. Ltd. is Singapore leading temporary works contractor for design, sheetpile, soldier pile, pre-broring, strutting and access platform works. It is also a specialist temporary earth retaining wall contractor capable of contracting projects from soldier pile, sheetpile and grout-mix pile earth retaining system and internal support system such as shotcrete, ground anchor and strutting system.
Kian Hock Engineering Pte Ltd currently have 4 nos excavators vibro, 2 nos of pre-boring machine, 8 nos of silent piler, 1 nos of 65 tons crawler crane, 1 nos 20 tonne lorry crane and 5000 tons of sheetpile piles, soldier pile, strutings and metro deckings. The partial project track records for this 3 years attached for reference.
Recent key projects, which is installation and removal of temporary earth retaining works and access platform in contract for MRT Circle Line Project C821, C825, C421, C855, C825, C424, C423, LT143, LT134 and etc. It is also an active temporary works contractor in various LTA and private projects.
We also actively involved in PUB drainage works for International Rd (5.2 million), HDB projects Canberra Links at Sembawang Rd (10.8 million) and PUB Deep Tunnel Sewerage System Works at Defu Lane for Contract 1 (5 million) and PUB Deep Tunnel Sewerage System at Tampines Rd Contract 2 (7 million).